Land leveling works, internal and bypass roads, the length of the road is 70 thousand linear metres
Land leveling work: 5,800,000 square meters, internal and bypass road leveling, length of the road: 70,000 linear meters
Security fence works with a length of 10,000 meters and a height of 3 meters, including excavation, backfilling and concrete works, and the supply and installation of the fence according to industrial security specifications.
Cable tranching work for all sizes of light, medium, and high-tension cables, approximately 90,000 linear meters, including excavation, backfilling, fine red sand, warning tape, and safety requirements.
Electrical and mechanical works for the station, control rooms, housing, security rooms, entrances and gates, including ventilation, air conditioning, lighting, electricity, alarm and surveillance system, and external lighting
Rain drainage and road crossing works, the entire project area